A detached garage, workshop, shed, barn, or other outbuilding can usually be supplied from the main building, but the right design depends on what you plan to power and how the buildings are laid out.
A couple of lights and receptacles may need only a modest circuit. A workshop with a welder, compressor, heater, EV charger, or future equipment may justify a feeder and a panel in the detached building. The important part is planning the load and wiring method before anyone starts digging a trench.
Do I Need a Single Circuit or a Subpanel?
That depends on the intended use.
If the detached building only needs a small amount of power, one branch circuit may be enough. For example, a simple storage shed with lighting and a few receptacles may not need its own panel.
A larger garage or workshop often benefits from a feeder supplying a panel in the outbuilding. That gives the building its own branch-circuit distribution for lighting, receptacles, tools, door openers, heating equipment, or future additions.
Installing a panel does not automatically mean the house needs a service upgrade. The existing service and panel still need enough capacity for the added load. Our guide to electrical panel upgrades explains the difference between panel condition, available breaker space, and actual service capacity.
Can I Just Run Three Wires to the Detached Building?
For new work, a detached building feeder is generally designed with separate neutral and equipment-grounding conductors rather than using the neutral as the grounding path.
That distinction matters. The neutral carries normal return current. The equipment-grounding conductor is there for fault clearing and bonding metal enclosures and equipment.
Inside a detached-building subpanel, the neutral and equipment grounding conductors are normally kept separated. Improperly tying them back together can put normal current onto grounding paths and metal parts.
The same basic principle is why a bootleg ground is not a legitimate substitute for a proper equipment-grounding path.
If I Install Ground Rods, Do I Still Need a Ground Wire From the House?
Yes, in a typical new feeder installation.
Grounding electrodes at the detached building and the equipment-grounding conductor serving the building perform different jobs. Ground rods do not replace the equipment-grounding conductor that runs with the feeder conductors.
The grounding electrode system helps connect the building’s electrical system to earth. The equipment-grounding conductor provides a low-impedance fault path back toward the source so protective devices can operate when a fault occurs.
This is one of those areas where the words “ground” and “grounding” get used for several different functions, which is why improvised installations can look reasonable while still being electrically wrong.
Does the Detached Building Need a Disconnect?
A detached structure supplied by electrical power generally needs a suitable way to disconnect the building’s electrical supply.
Depending on the design, the main breaker or disconnecting means associated with the outbuilding panel may serve that purpose. The exact arrangement depends on the equipment, feeder design, building layout, and applicable code.
The disconnect should be planned as part of the system rather than treated as an afterthought after the feeder is already installed.
Should the Wiring Be Underground or Overhead?
Either can be practical depending on the property.
An underground installation may provide a cleaner finished appearance and avoid overhead clearances, but it requires trenching and a wiring method suitable for the location. The required burial depth depends on factors such as the wiring method, raceway, circuit characteristics, and where the route passes.
An overhead feeder may avoid trenching, but it introduces clearance requirements around driveways, roofs, walkways, and other areas.
Do not choose the route based only on the shortest distance. Septic systems, drainage, retaining walls, future construction, vehicle traffic, and other underground utilities can all affect the better path.
Before excavation, underground utilities should be located through the appropriate utility-marking process. Private wiring, septic components, or other customer-owned underground systems may not be identified by the standard utility locate.
How Large Should the Feeder Be?
The feeder should be sized for the actual and reasonably anticipated load, not simply for whatever breaker happens to fit in the main panel.
Useful questions include:
- Will the building have only lights and convenience receptacles?
- Will it have electric heat or air conditioning?
- Is a welder, air compressor, woodworking equipment, or vehicle lift planned?
- Could an EV charger be added later?
- Will larger motors start while other equipment is running?
- How far is the detached building from the source panel?
Long runs can make voltage drop more important, particularly when equipment has high starting current.
Planning for realistic future use can be worthwhile. Digging the yard twice because the workshop grew faster than expected is not anyone’s favorite encore.
Can I Put a 100-Amp Panel in the Garage If the Feeder Is Smaller?
The rating printed on a panel does not mean the feeder must supply that full amount.
A panel rated for 100 amps may sometimes be used with a smaller properly protected feeder, provided the equipment is suitable for the application and the feeder overcurrent protection limits the available current appropriately.
Panel rating, feeder size, breaker size, and calculated load all have to work together. The number on the panel door is not a permission slip to draw that amount of power.
What About a Welder, Compressor, or Other Shop Equipment?
Those loads should be considered before the feeder is sized.
Motors may draw much more current while starting than during normal operation. Welders can have electrical requirements that depend on their duty cycle and equipment rating. Heating equipment and EV charging can add significant sustained load.
If the building is intended to function as a real workshop, the electrical design should reflect the equipment that will actually be used there rather than treating everything as ordinary receptacle load.
Will I Need a Permit or Inspection?
Possibly. Requirements depend on the property location, project scope, and the authority having jurisdiction.
A new feeder, underground raceway, detached-building panel, or significant new branch-circuit work is exactly the kind of project where it makes sense to confirm requirements before trenching or covering wiring.
Our guide to electrical permits and inspections in North-Central West Virginia explains why requirements can differ between municipalities and other jurisdictions.
What Should I Decide Before Calling an Electrician?
The most useful information is practical rather than technical:
- What the building will be used for.
- The major equipment you expect to operate.
- Whether heat, air conditioning, an EV charger, welder, compressor, or other large load is planned.
- Approximate distance between the buildings.
- Where the existing electrical panel is located.
- Whether you prefer an underground or overhead route.
- Any known utilities, septic systems, driveways, retaining walls, or other obstacles along the path.
- Future plans for the building.
You do not need to size the feeder yourself. The goal is to make sure the design is based on how the building will actually be used.
Bottom Line
Running power to a detached garage or outbuilding is more than burying a cable and installing a small panel.
A good installation considers the building load, feeder size, wiring method, voltage drop, neutral and grounding arrangement, grounding electrodes, disconnecting means, physical route, permits, and future expansion.
For detached garages, workshops, barns, sheds, and other outbuilding electrical work in North Central West Virginia, request a consultation with State of the Arc Electric.
Related Electrical Issues
See also electrical panel upgrades, bootleg grounds, and electrical permits and inspections.